Leila iBite

Capsuleer

Modules for sale
19
Modules created
1,064
Total value
1.5 billion ISK

Category

Meta Group

Meta Level

Est. value

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort
Display:
Attribute Bars:
Page 1
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.1GJ -11.9GJ
duration
Activation time / duration
44.39s -0.61s
cpu
CPU usage
50.86tf -9.14tf
miningCritBonusYield
Critical Success Bonus Yield
160.49% -39.51%
miningCritChance
Critical Success Chance
1.04% +0.04%
miningAmount
Mining amount
132.73m3 +12.73m3
maxRange
Optimal Range
12504m -2496m
power
Powergrid Usage
15.95MW +3.95MW
miningWasteProbability
Residue Probability
39.08% +5.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.953x -0.047
effectiveMiningSpeed
Effective Mining Speed
3.04m³/s +0.32m³/s
56 million ISK est. 46 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.42GJ -1.58GJ
duration
Activation time / duration
45.42s +0.42s
cpu
CPU usage
84.58tf +24.58tf
miningCritBonusYield
Critical Success Bonus Yield
206.27% +6.27%
miningCritChance
Critical Success Chance
1.11% +0.11%
miningAmount
Mining amount
133.54m3 +13.54m3
maxRange
Optimal Range
11398.5m -3601.5m
power
Powergrid Usage
10.21MW -1.79MW
miningWasteProbability
Residue Probability
32.57% -1.43%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.127x +0.127
effectiveMiningSpeed
Effective Mining Speed
3.01m³/s +0.29m³/s
56 million ISK est. 55 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.67GJ -8.33GJ
duration
Activation time / duration
40.78s -4.22s
cpu
CPU usage
48.88tf -11.12tf
miningCritBonusYield
Critical Success Bonus Yield
227.27% +27.27%
miningCritChance
Critical Success Chance
0.99% -0.01%
miningAmount
Mining amount
133.21m3 +13.21m3
maxRange
Optimal Range
12594.75m -2405.25m
power
Powergrid Usage
14.4MW +2.4MW
miningWasteProbability
Residue Probability
36.73% +2.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.986x -0.014
effectiveMiningSpeed
Effective Mining Speed
3.34m³/s +0.62m³/s
250 million ISK est. 161 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.62GJ +5.62GJ
duration
Activation time / duration
43.53s -1.47s
cpu
CPU usage
87.86tf +27.86tf
miningCritBonusYield
Critical Success Bonus Yield
204.59% +4.59%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
144.71m3 +24.71m3
maxRange
Optimal Range
13675.5m -1324.5m
power
Powergrid Usage
10.26MW -1.74MW
miningWasteProbability
Residue Probability
39.73% +5.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.044x +0.044
effectiveMiningSpeed
Effective Mining Speed
3.39m³/s +0.67m³/s
333 million ISK est. 269 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.18GJ +4.18GJ
duration
Activation time / duration
45.26s +0.26s
cpu
CPU usage
85.97tf +25.97tf
miningCritBonusYield
Critical Success Bonus Yield
221.88% +21.88%
miningCritChance
Critical Success Chance
0.74% -0.26%
miningAmount
Mining amount
135.97m3 +15.97m3
maxRange
Optimal Range
19359.75m +4359.75m
power
Powergrid Usage
16.98MW +4.97MW
miningWasteProbability
Residue Probability
43.04% +9.04%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.803x -0.197
effectiveMiningSpeed
Effective Mining Speed
3.05m³/s +0.33m³/s
78 million ISK est. 93 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.44GJ -1.56GJ
duration
Activation time / duration
43.75s -1.25s
cpu
CPU usage
70.89tf +10.89tf
miningCritBonusYield
Critical Success Bonus Yield
220.83% +20.83%
miningCritChance
Critical Success Chance
0.89% -0.11%
miningAmount
Mining amount
125.87m3 +5.87m3
maxRange
Optimal Range
17008.5m +2008.5m
power
Powergrid Usage
17.11MW +5.11MW
miningWasteProbability
Residue Probability
42.98% +8.98%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.057x +0.057
effectiveMiningSpeed
Effective Mining Speed
2.93m³/s +0.21m³/s
44 million ISK est. 83 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.67GJ -8.33GJ
duration
Activation time / duration
46.28s +1.28s
cpu
CPU usage
66.23tf +6.23tf
miningCritBonusYield
Critical Success Bonus Yield
173.93% -26.07%
miningCritChance
Critical Success Chance
0.85% -0.15%
miningAmount
Mining amount
137.96m3 +17.96m3
maxRange
Optimal Range
17825.25m +2825.25m
power
Powergrid Usage
15.76MW +3.76MW
miningWasteProbability
Residue Probability
40.45% +6.45%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.848x -0.152
effectiveMiningSpeed
Effective Mining Speed
3.02m³/s +0.3m³/s
78 million ISK est. 40 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.41GJ +0.41GJ
duration
Activation time / duration
44.81s -0.19s
cpu
CPU usage
73.03tf +13.03tf
miningCritBonusYield
Critical Success Bonus Yield
208.86% +8.86%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
132.62m3 +12.62m3
maxRange
Optimal Range
11530.5m -3469.5m
power
Powergrid Usage
16.45MW +4.45MW
miningWasteProbability
Residue Probability
26.68% -7.32%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.095x +0.095
effectiveMiningSpeed
Effective Mining Speed
3.01m³/s +0.29m³/s
44 million ISK est. 36 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.66GJ -3.34GJ
duration
Activation time / duration
43.19s -1.81s
cpu
CPU usage
89.71tf +29.71tf
miningCritBonusYield
Critical Success Bonus Yield
166.23% -33.77%
miningCritChance
Critical Success Chance
1% 0%
miningAmount
Mining amount
118.9m3 -1.1m3
maxRange
Optimal Range
15267.75m +267.75m
power
Powergrid Usage
12.91MW +0.91MW
miningWasteProbability
Residue Probability
24.27% -9.73%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.088x +0.088
effectiveMiningSpeed
Effective Mining Speed
2.8m³/s +0.08m³/s
30 million ISK est. 22 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.6GJ -8.4GJ
duration
Activation time / duration
47.66s +2.66s
cpu
CPU usage
65.3tf +5.3tf
miningCritBonusYield
Critical Success Bonus Yield
173.02% -26.98%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
136.94m3 +16.94m3
maxRange
Optimal Range
18163.5m +3163.5m
power
Powergrid Usage
17.6MW +5.6MW
miningWasteProbability
Residue Probability
30.1% -3.9%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.086x +0.086
effectiveMiningSpeed
Effective Mining Speed
2.91m³/s +0.19m³/s
44 million ISK est. 40 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
38.88GJ +8.88GJ
duration
Activation time / duration
49.23s +4.23s
cpu
CPU usage
51.78tf -8.22tf
miningCritBonusYield
Critical Success Bonus Yield
204.73% +4.73%
miningCritChance
Critical Success Chance
1.05% +0.05%
miningAmount
Mining amount
148.39m3 +28.39m3
maxRange
Optimal Range
13535.25m -1464.75m
power
Powergrid Usage
14.51MW +2.51MW
miningWasteProbability
Residue Probability
42.1% +8.1%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.045x +0.045
effectiveMiningSpeed
Effective Mining Speed
3.08m³/s +0.36m³/s
100 million ISK est. 68 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.75GJ +7.75GJ
duration
Activation time / duration
48.42s +3.42s
cpu
CPU usage
59.63tf -0.37tf
miningCritBonusYield
Critical Success Bonus Yield
196.61% -3.39%
miningCritChance
Critical Success Chance
0.8% -0.2%
miningAmount
Mining amount
146.23m3 +26.23m3
maxRange
Optimal Range
15507m +507m
power
Powergrid Usage
17.92MW +5.92MW
miningWasteProbability
Residue Probability
39.59% +5.59%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.043x +0.043
effectiveMiningSpeed
Effective Mining Speed
3.07m³/s +0.35m³/s
67 million ISK est. 110 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.99GJ +7.99GJ
duration
Activation time / duration
43.2s -1.8s
cpu
CPU usage
67.15tf +7.15tf
miningCritBonusYield
Critical Success Bonus Yield
165.25% -34.75%
miningCritChance
Critical Success Chance
0.75% -0.25%
miningAmount
Mining amount
137.53m3 +17.53m3
maxRange
Optimal Range
12099.75m -2900.25m
power
Powergrid Usage
13.46MW +1.46MW
miningWasteProbability
Residue Probability
36.26% +2.26%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.893x -0.107
effectiveMiningSpeed
Effective Mining Speed
3.22m³/s +0.5m³/s
140 million ISK est. 93 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.11GJ +5.11GJ
duration
Activation time / duration
46.53s +1.53s
cpu
CPU usage
71.94tf +11.94tf
miningCritBonusYield
Critical Success Bonus Yield
184.99% -15.01%
miningCritChance
Critical Success Chance
0.93% -0.07%
miningAmount
Mining amount
144.93m3 +24.93m3
maxRange
Optimal Range
12751.5m -2248.5m
power
Powergrid Usage
13.48MW +1.48MW
miningWasteProbability
Residue Probability
43.42% +9.43%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.913x -0.087
effectiveMiningSpeed
Effective Mining Speed
3.17m³/s +0.45m³/s
111 million ISK est. 112 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.84GJ -5.16GJ
duration
Activation time / duration
46.76s +1.76s
cpu
CPU usage
81.35tf +21.35tf
miningCritBonusYield
Critical Success Bonus Yield
160.7% -39.3%
miningCritChance
Critical Success Chance
1.15% +0.15%
miningAmount
Mining amount
139.85m3 +19.85m3
maxRange
Optimal Range
14550m -450m
power
Powergrid Usage
17.39MW +5.39MW
miningWasteProbability
Residue Probability
40.77% +6.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.123x +0.123
effectiveMiningSpeed
Effective Mining Speed
3.05m³/s +0.33m³/s
50 million ISK est. 50 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.08GJ +4.08GJ
duration
Activation time / duration
45.36s +0.36s
cpu
CPU usage
86.18tf +26.18tf
miningCritBonusYield
Critical Success Bonus Yield
199.34% -0.66%
miningCritChance
Critical Success Chance
0.96% -0.04%
miningAmount
Mining amount
135.97m3 +15.97m3
maxRange
Optimal Range
15185.25m +185.25m
power
Powergrid Usage
12.76MW +0.76MW
miningWasteProbability
Residue Probability
39.65% +5.65%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.925x -0.075
effectiveMiningSpeed
Effective Mining Speed
3.06m³/s +0.34m³/s
67 million ISK est. 62 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.38GJ -3.62GJ
duration
Activation time / duration
44.04s -0.96s
cpu
CPU usage
81.01tf +21.01tf
miningCritBonusYield
Critical Success Bonus Yield
161.26% -38.74%
miningCritChance
Critical Success Chance
0.77% -0.23%
miningAmount
Mining amount
135.75m3 +15.75m3
maxRange
Optimal Range
11613m -3387m
power
Powergrid Usage
12.54MW +0.54MW
miningWasteProbability
Residue Probability
24.11% -9.89%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.022x +0.022
effectiveMiningSpeed
Effective Mining Speed
3.12m³/s +0.4m³/s
89 million ISK est. 64 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.56GJ -4.44GJ
duration
Activation time / duration
46.29s +1.29s
cpu
CPU usage
74.25tf +14.25tf
miningCritBonusYield
Critical Success Bonus Yield
175.33% -24.67%
miningCritChance
Critical Success Chance
1.06% +0.06%
miningAmount
Mining amount
138.61m3 +18.61m3
maxRange
Optimal Range
12306m -2694m
power
Powergrid Usage
15.35MW +3.35MW
miningWasteProbability
Residue Probability
36.45% +2.45%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.904x -0.096
effectiveMiningSpeed
Effective Mining Speed
3.05m³/s +0.33m³/s
67 million ISK est. 39 million ISK
Abyssal Modulated Strip Miner Modulated Strip Miner II Gravid Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.02GJ +4.02GJ
duration
Activation time / duration
45.05s +0.05s
cpu
CPU usage
60.23tf +0.23tf
miningCritBonusYield
Critical Success Bonus Yield
182.05% -17.95%
miningCritChance
Critical Success Chance
0.93% -0.07%
miningAmount
Mining amount
135.61m3 +15.61m3
maxRange
Optimal Range
13782m -1218m
power
Powergrid Usage
12.47MW +0.47MW
miningWasteProbability
Residue Probability
34.92% +0.93%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.02x +0.02
effectiveMiningSpeed
Effective Mining Speed
3.06m³/s +0.34m³/s
60 million ISK est. 62 million ISK
Display:
Attribute Bars:
Page 1