Abyssal Modulated Deep Core Strip Miner Modulated Deep Core Strip Miner II Unstable Modulated Deep Core Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.69GJ -1.31GJ
duration
Activation time / duration
41.25s -3.75s
cpu
CPU usage
64.55tf +4.55tf
miningCritBonusYield
Critical Success Bonus Yield
200.18% +0.18%
miningCritChance
Critical Success Chance
0.82% -0.17%
miningAmount
Mining amount
94.03m3 +14.03m3
maxRange
Optimal Range
17660.25m +2660.25m
power
Powergrid Usage
14.05MW +2.05MW
miningWasteProbability
Residue Probability
30.12% -3.88%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.966x -0.034
effectiveMiningSpeed
Effective Mining Speed
2.32m³/s +0.5m³/s
est. 33 million ISK Created by Samunuri Erata

AI value prediction

Evaluated 5 d ago

Confidence Very low R² -0.80
Bias score Very low 146 samples
Avg. error (MAE) ±56M the lower, the better
Last trained 3 h ago
Training data
Tech II 146
View historic sales →
Search type
Modulated Deep Core Strip Miner II
5