cao an wtf

Capsuleer

Modules for sale
0
Modules created
1,096
Total value
176 billion ISK
Goldbars
4
Brownbars
3

Category

Meta Group

Meta Level

Est. value

ISK 1M
ISK 100B
1M
10M
100M
1B
10B
100B
Sort
Display:
Attribute Bars:
Page 1
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
15.81GJ -7.19GJ
duration
Activation time / duration
41.4s -3.6s
cpu
CPU usage
41.99tf -8.01tf
miningCritBonusYield
Critical Success Bonus Yield
170.57% -29.43%
miningCritChance
Critical Success Chance
1.13% +0.13%
miningAmount
Mining amount
233.18m3 +33.18m3
maxRange
Optimal Range
16527.19m -2222.81m
power
Powergrid Usage
13.89MW +3.89MW
effectiveMiningSpeed
Effective Mining Speed
5.74m³/s +1.21m³/s
est. 2.3 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
21.4GJ -1.6GJ
duration
Activation time / duration
41.22s -3.78s
cpu
CPU usage
63.45tf +13.45tf
miningCritBonusYield
Critical Success Bonus Yield
183.17% -16.83%
miningCritChance
Critical Success Chance
1.25% +0.25%
miningAmount
Mining amount
228.86m3 +28.86m3
maxRange
Optimal Range
22735.31m +3985.31m
power
Powergrid Usage
14.82MW +4.82MW
effectiveMiningSpeed
Effective Mining Speed
5.68m³/s +1.15m³/s
est. 2.2 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
25.15GJ +2.15GJ
duration
Activation time / duration
40.96s -4.04s
cpu
CPU usage
57.4tf +7.39tf
miningCritBonusYield
Critical Success Bonus Yield
161.96% -38.04%
miningCritChance
Critical Success Chance
1.12% +0.12%
miningAmount
Mining amount
238.31m3 +38.31m3
maxRange
Optimal Range
17300.63m -1449.38m
power
Powergrid Usage
11.45MW +1.45MW
effectiveMiningSpeed
Effective Mining Speed
5.92m³/s +1.39m³/s
est. 2.1 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
23.28GJ +0.28GJ
duration
Activation time / duration
41.88s -3.12s
cpu
CPU usage
52.22tf +2.21tf
miningCritBonusYield
Critical Success Bonus Yield
188.21% -11.79%
miningCritChance
Critical Success Chance
1.27% +0.27%
miningAmount
Mining amount
252.35m3 +52.35m3
maxRange
Optimal Range
19208.44m +458.44m
power
Powergrid Usage
11.78MW +1.78MW
effectiveMiningSpeed
Effective Mining Speed
6.17m³/s +1.64m³/s
est. 2.1 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
16.49GJ -6.51GJ
duration
Activation time / duration
41.17s -3.83s
cpu
CPU usage
67.72tf +17.72tf
miningCritBonusYield
Critical Success Bonus Yield
190.73% -9.27%
miningCritChance
Critical Success Chance
0.81% -0.19%
miningAmount
Mining amount
255.86m3 +55.86m3
maxRange
Optimal Range
20229.37m +1479.37m
power
Powergrid Usage
9.37MW -0.63MW
effectiveMiningSpeed
Effective Mining Speed
6.31m³/s +1.78m³/s
est. 1.9 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.27GJ -1.73GJ
duration
Activation time / duration
41.45s -3.55s
cpu
CPU usage
76.22tf +16.22tf
miningCritBonusYield
Critical Success Bonus Yield
228.67% +28.67%
miningCritChance
Critical Success Chance
1.27% +0.27%
miningAmount
Mining amount
152.65m3 +32.65m3
maxRange
Optimal Range
11497.5m -3502.5m
power
Powergrid Usage
14.53MW +2.53MW
miningWasteProbability
Residue Probability
24.49% -9.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.867x -0.133
effectiveMiningSpeed
Effective Mining Speed
3.79m³/s +1.07m³/s
est. 1.8 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.31GJ -5.69GJ
duration
Activation time / duration
41.21s -3.79s
cpu
CPU usage
77.36tf +17.36tf
miningCritBonusYield
Critical Success Bonus Yield
219.57% +19.57%
miningCritChance
Critical Success Chance
0.79% -0.21%
miningAmount
Mining amount
149.09m3 +29.09m3
maxRange
Optimal Range
13436.25m -1563.75m
power
Powergrid Usage
17.31MW +5.31MW
miningWasteProbability
Residue Probability
26.98% -7.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.026x +0.026
effectiveMiningSpeed
Effective Mining Speed
3.68m³/s +0.96m³/s
est. 1.6 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.14GJ +1.14GJ
duration
Activation time / duration
42.38s -2.62s
cpu
CPU usage
54.07tf +4.07tf
miningCritBonusYield
Critical Success Bonus Yield
183.87% -16.13%
miningCritChance
Critical Success Chance
0.96% -0.04%
miningAmount
Mining amount
230.48m3 +30.48m3
maxRange
Optimal Range
20910m +2160m
power
Powergrid Usage
12.05MW +2.05MW
effectiveMiningSpeed
Effective Mining Speed
5.53m³/s +1m³/s
est. 1.6 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.64GJ -4.36GJ
duration
Activation time / duration
41.31s -3.69s
cpu
CPU usage
69.5tf +19.5tf
miningCritBonusYield
Critical Success Bonus Yield
196.05% -3.95%
miningCritChance
Critical Success Chance
0.78% -0.22%
miningAmount
Mining amount
236.33m3 +36.33m3
maxRange
Optimal Range
19961.25m +1211.25m
power
Powergrid Usage
14.93MW +4.93MW
effectiveMiningSpeed
Effective Mining Speed
5.81m³/s +1.27m³/s
est. 1.6 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.3GJ +1.3GJ
duration
Activation time / duration
41.85s -3.15s
cpu
CPU usage
65.89tf +5.89tf
miningCritBonusYield
Critical Success Bonus Yield
187.65% -12.35%
miningCritChance
Critical Success Chance
0.69% -0.32%
miningAmount
Mining amount
149.41m3 +29.41m3
maxRange
Optimal Range
12578.25m -2421.75m
power
Powergrid Usage
17.74MW +5.74MW
miningWasteProbability
Residue Probability
24.94% -9.06%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.992x -0.008
effectiveMiningSpeed
Effective Mining Speed
3.62m³/s +0.9m³/s
est. 1.6 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
37.87GJ +7.87GJ
duration
Activation time / duration
41.27s -3.73s
cpu
CPU usage
54.59tf -5.41tf
miningCritBonusYield
Critical Success Bonus Yield
222.3% +22.3%
miningCritChance
Critical Success Chance
0.95% -0.05%
miningAmount
Mining amount
150.6m3 +30.6m3
maxRange
Optimal Range
15729.75m +729.75m
power
Powergrid Usage
10.89MW -1.11MW
miningWasteProbability
Residue Probability
26.47% -7.53%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.139x +0.139
effectiveMiningSpeed
Effective Mining Speed
3.73m³/s +1.01m³/s
est. 1.5 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.36GJ -11.64GJ
duration
Activation time / duration
41.44s -3.56s
cpu
CPU usage
64.13tf +4.13tf
miningCritBonusYield
Critical Success Bonus Yield
196.33% -3.67%
miningCritChance
Critical Success Chance
1.18% +0.18%
miningAmount
Mining amount
154m3 +34m3
maxRange
Optimal Range
13518.75m -1481.25m
power
Powergrid Usage
14.53MW +2.53MW
miningWasteProbability
Residue Probability
25.9% -8.1%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.872x -0.128
effectiveMiningSpeed
Effective Mining Speed
3.8m³/s +1.08m³/s
est. 1.4 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
28.44GJ -1.56GJ
duration
Activation time / duration
41.11s -3.89s
cpu
CPU usage
55.22tf -4.78tf
miningCritBonusYield
Critical Success Bonus Yield
175.26% -24.74%
miningCritChance
Critical Success Chance
1.18% +0.18%
miningAmount
Mining amount
155.08m3 +35.08m3
maxRange
Optimal Range
11431.5m -3568.5m
power
Powergrid Usage
15.69MW +3.69MW
miningWasteProbability
Residue Probability
39.02% +5.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.088x +0.088
effectiveMiningSpeed
Effective Mining Speed
3.85m³/s +1.13m³/s
est. 1.4 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
19.46GJ -10.54GJ
duration
Activation time / duration
41.81s -3.19s
cpu
CPU usage
62.66tf +2.66tf
miningCritBonusYield
Critical Success Bonus Yield
206.69% +6.69%
miningCritChance
Critical Success Chance
1.17% +0.17%
miningAmount
Mining amount
153.73m3 +33.73m3
maxRange
Optimal Range
12132.75m -2867.25m
power
Powergrid Usage
15.53MW +3.53MW
miningWasteProbability
Residue Probability
35.94% +1.94%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.952x -0.048
effectiveMiningSpeed
Effective Mining Speed
3.77m³/s +1.05m³/s
est. 1.3 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.38GJ +2.38GJ
duration
Activation time / duration
41.13s -3.87s
cpu
CPU usage
78.03tf +18.03tf
miningCritBonusYield
Critical Success Bonus Yield
197.59% -2.41%
miningCritChance
Critical Success Chance
1.29% +0.29%
miningAmount
Mining amount
155.78m3 +35.78m3
maxRange
Optimal Range
18196.5m +3196.5m
power
Powergrid Usage
11.73MW -0.27MW
miningWasteProbability
Residue Probability
35.8% +1.79%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.008x +0.008
effectiveMiningSpeed
Effective Mining Speed
3.88m³/s +1.16m³/s
est. 1.3 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
27.86GJ -2.14GJ
duration
Activation time / duration
41.6s -3.4s
cpu
CPU usage
80.55tf +20.55tf
miningCritBonusYield
Critical Success Bonus Yield
192.83% -7.17%
miningCritChance
Critical Success Chance
1.23% +0.23%
miningAmount
Mining amount
154m3 +34m3
maxRange
Optimal Range
11514m -3486m
power
Powergrid Usage
13.67MW +1.67MW
miningWasteProbability
Residue Probability
41.38% +7.38%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.129x +0.129
effectiveMiningSpeed
Effective Mining Speed
3.79m³/s +1.07m³/s
est. 1.3 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
19.87GJ -3.13GJ
duration
Activation time / duration
43.91s -1.09s
cpu
CPU usage
42.24tf -7.76tf
miningCritBonusYield
Critical Success Bonus Yield
227.9% +27.9%
miningCritChance
Critical Success Chance
0.71% -0.29%
miningAmount
Mining amount
247.13m3 +47.13m3
maxRange
Optimal Range
21930.94m +3180.94m
power
Powergrid Usage
10MW +0MW
effectiveMiningSpeed
Effective Mining Speed
5.72m³/s +1.19m³/s
est. 1.3 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
16.82GJ -6.18GJ
duration
Activation time / duration
46.53s +1.53s
cpu
CPU usage
45.7tf -4.29tf
miningCritBonusYield
Critical Success Bonus Yield
162.73% -37.27%
miningCritChance
Critical Success Chance
1.17% +0.17%
miningAmount
Mining amount
256.49m3 +56.49m3
maxRange
Optimal Range
22694.06m +3944.06m
power
Powergrid Usage
11.77MW +1.77MW
effectiveMiningSpeed
Effective Mining Speed
5.62m³/s +1.08m³/s
est. 1.2 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
35.16GJ +5.16GJ
duration
Activation time / duration
40.52s -4.48s
cpu
CPU usage
78.83tf +18.83tf
miningCritBonusYield
Critical Success Bonus Yield
203.33% +3.33%
miningCritChance
Critical Success Chance
0.68% -0.32%
miningAmount
Mining amount
154.81m3 +34.81m3
maxRange
Optimal Range
16736.25m +1736.25m
power
Powergrid Usage
16.35MW +4.35MW
miningWasteProbability
Residue Probability
37.08% +3.08%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.936x -0.064
effectiveMiningSpeed
Effective Mining Speed
3.87m³/s +1.15m³/s
est. 1.2 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
39.86GJ +9.86GJ
duration
Activation time / duration
40.66s -4.34s
cpu
CPU usage
50.56tf -9.44tf
miningCritBonusYield
Critical Success Bonus Yield
213.62% +13.62%
miningCritChance
Critical Success Chance
0.79% -0.21%
miningAmount
Mining amount
150.11m3 +30.11m3
maxRange
Optimal Range
18048m +3048m
power
Powergrid Usage
13.21MW +1.21MW
miningWasteProbability
Residue Probability
34.61% +0.61%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.8x -0.2
effectiveMiningSpeed
Effective Mining Speed
3.75m³/s +1.03m³/s
est. 1.2 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
15.14GJ -7.86GJ
duration
Activation time / duration
45.37s +0.37s
cpu
CPU usage
57.26tf +7.25tf
miningCritBonusYield
Critical Success Bonus Yield
192.48% -7.52%
miningCritChance
Critical Success Chance
1.3% +0.3%
miningAmount
Mining amount
255.14m3 +55.14m3
maxRange
Optimal Range
19765.31m +1015.31m
power
Powergrid Usage
9.67MW -0.33MW
effectiveMiningSpeed
Effective Mining Speed
5.76m³/s +1.23m³/s
est. 1.1 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
40.66GJ +10.66GJ
duration
Activation time / duration
41.12s -3.88s
cpu
CPU usage
56.65tf -3.35tf
miningCritBonusYield
Critical Success Bonus Yield
221.04% +21.04%
miningCritChance
Critical Success Chance
1.04% +0.04%
miningAmount
Mining amount
151.68m3 +31.68m3
maxRange
Optimal Range
18510m +3510m
power
Powergrid Usage
10.13MW -1.87MW
miningWasteProbability
Residue Probability
29.86% -4.14%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.147x +0.147
effectiveMiningSpeed
Effective Mining Speed
3.77m³/s +1.05m³/s
est. 1.1 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.62GJ -5.38GJ
duration
Activation time / duration
42.76s -2.24s
cpu
CPU usage
82.36tf +22.36tf
miningCritBonusYield
Critical Success Bonus Yield
174.77% -25.23%
miningCritChance
Critical Success Chance
1.27% +0.27%
miningAmount
Mining amount
154.06m3 +34.06m3
maxRange
Optimal Range
18930.75m +3930.75m
power
Powergrid Usage
10.89MW -1.11MW
miningWasteProbability
Residue Probability
23.98% -10.02%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.919x -0.081
effectiveMiningSpeed
Effective Mining Speed
3.68m³/s +0.96m³/s
est. 1 billion ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
15.38GJ -7.62GJ
duration
Activation time / duration
45.5s +0.5s
cpu
CPU usage
65.34tf +15.34tf
miningCritBonusYield
Critical Success Bonus Yield
221.67% +21.67%
miningCritChance
Critical Success Chance
1.28% +0.28%
miningAmount
Mining amount
238.94m3 +38.94m3
maxRange
Optimal Range
19559.06m +809.06m
power
Powergrid Usage
8.65MW -1.35MW
effectiveMiningSpeed
Effective Mining Speed
5.4m³/s +0.87m³/s
est. 1 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
29.66GJ -0.34GJ
duration
Activation time / duration
42.07s -2.93s
cpu
CPU usage
74.88tf +14.88tf
miningCritBonusYield
Critical Success Bonus Yield
186.32% -13.68%
miningCritChance
Critical Success Chance
0.79% -0.21%
miningAmount
Mining amount
155.03m3 +35.03m3
maxRange
Optimal Range
18650.25m +3650.25m
power
Powergrid Usage
17MW +5MW
miningWasteProbability
Residue Probability
32.23% -1.77%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.14x +0.14
effectiveMiningSpeed
Effective Mining Speed
3.74m³/s +1.02m³/s
est. 1 billion ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
39.43GJ +9.43GJ
duration
Activation time / duration
42.16s -2.83s
cpu
CPU usage
88.15tf +28.15tf
miningCritBonusYield
Critical Success Bonus Yield
165.04% -34.96%
miningCritChance
Critical Success Chance
1.27% +0.28%
miningAmount
Mining amount
153.03m3 +33.03m3
maxRange
Optimal Range
16959m +1959m
power
Powergrid Usage
11.6MW -0.4MW
miningWasteProbability
Residue Probability
28.17% -5.83%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.889x -0.111
effectiveMiningSpeed
Effective Mining Speed
3.71m³/s +0.99m³/s
est. 996 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
23.98GJ -6.02GJ
duration
Activation time / duration
40.85s -4.15s
cpu
CPU usage
60.81tf +0.81tf
miningCritBonusYield
Critical Success Bonus Yield
208.86% +8.86%
miningCritChance
Critical Success Chance
1.23% +0.23%
miningAmount
Mining amount
151.9m3 +31.9m3
maxRange
Optimal Range
13683.75m -1316.25m
power
Powergrid Usage
16.22MW +4.22MW
miningWasteProbability
Residue Probability
32.25% -1.75%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.01x +0.01
effectiveMiningSpeed
Effective Mining Speed
3.81m³/s +1.09m³/s
est. 984 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
40.37GJ +10.37GJ
duration
Activation time / duration
40.55s -4.45s
cpu
CPU usage
55.69tf -4.31tf
miningCritBonusYield
Critical Success Bonus Yield
217.75% +17.75%
miningCritChance
Critical Success Chance
0.84% -0.16%
miningAmount
Mining amount
147.14m3 +27.14m3
maxRange
Optimal Range
14665.5m -334.5m
power
Powergrid Usage
11.5MW -0.5MW
miningWasteProbability
Residue Probability
35.67% +1.67%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.849x -0.151
effectiveMiningSpeed
Effective Mining Speed
3.69m³/s +0.97m³/s
est. 980 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
32.69GJ +2.69GJ
duration
Activation time / duration
41.14s -3.86s
cpu
CPU usage
61.61tf +1.61tf
miningCritBonusYield
Critical Success Bonus Yield
179.53% -20.47%
miningCritChance
Critical Success Chance
1.3% +0.3%
miningAmount
Mining amount
147.9m3 +27.9m3
maxRange
Optimal Range
14533.5m -466.5m
power
Powergrid Usage
12.52MW +0.52MW
miningWasteProbability
Residue Probability
31.47% -2.53%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.84x -0.16
effectiveMiningSpeed
Effective Mining Speed
3.68m³/s +0.96m³/s
est. 948 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
24.89GJ -5.11GJ
duration
Activation time / duration
40.99s -4s
cpu
CPU usage
77.86tf +17.86tf
miningCritBonusYield
Critical Success Bonus Yield
168.05% -31.95%
miningCritChance
Critical Success Chance
0.76% -0.24%
miningAmount
Mining amount
151.84m3 +31.84m3
maxRange
Optimal Range
13840.5m -1159.5m
power
Powergrid Usage
12.67MW +0.67MW
miningWasteProbability
Residue Probability
40.06% +6.06%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.899x -0.101
effectiveMiningSpeed
Effective Mining Speed
3.75m³/s +1.03m³/s
est. 937 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.51GJ +3.51GJ
duration
Activation time / duration
42.97s -2.03s
cpu
CPU usage
44.2tf -5.8tf
miningCritBonusYield
Critical Success Bonus Yield
190.31% -9.69%
miningCritChance
Critical Success Chance
1.15% +0.15%
miningAmount
Mining amount
226.07m3 +26.07m3
maxRange
Optimal Range
18197.81m -552.19m
power
Powergrid Usage
12.58MW +2.58MW
effectiveMiningSpeed
Effective Mining Speed
5.38m³/s +0.84m³/s
est. 934 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
26.7GJ +3.7GJ
duration
Activation time / duration
48.64s +3.64s
cpu
CPU usage
45.08tf -4.92tf
miningCritBonusYield
Critical Success Bonus Yield
177.78% -22.22%
miningCritChance
Critical Success Chance
1.15% +0.15%
miningAmount
Mining amount
240.29m3 +40.29m3
maxRange
Optimal Range
21642.19m +2892.19m
power
Powergrid Usage
12.35MW +2.35MW
effectiveMiningSpeed
Effective Mining Speed
5.04m³/s +0.51m³/s
est. 933 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
34.01GJ +4.01GJ
duration
Activation time / duration
40.65s -4.35s
cpu
CPU usage
60.1tf +0.1tf
miningCritBonusYield
Critical Success Bonus Yield
206.83% +6.83%
miningCritChance
Critical Success Chance
0.98% -0.02%
miningAmount
Mining amount
146.17m3 +26.17m3
maxRange
Optimal Range
11844m -3156m
power
Powergrid Usage
11.52MW -0.48MW
miningWasteProbability
Residue Probability
26.51% -7.49%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.819x -0.181
effectiveMiningSpeed
Effective Mining Speed
3.67m³/s +0.95m³/s
est. 902 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.41GJ +8.41GJ
duration
Activation time / duration
46.14s +1.14s
cpu
CPU usage
43.19tf -6.82tf
miningCritBonusYield
Critical Success Bonus Yield
189.12% -10.88%
miningCritChance
Critical Success Chance
1.22% +0.22%
miningAmount
Mining amount
238.49m3 +38.49m3
maxRange
Optimal Range
14557.5m -4192.5m
power
Powergrid Usage
10.07MW +0.07MW
effectiveMiningSpeed
Effective Mining Speed
5.29m³/s +0.76m³/s
est. 896 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.23GJ +8.22GJ
duration
Activation time / duration
48.84s +3.84s
cpu
CPU usage
40.17tf -9.82tf
miningCritBonusYield
Critical Success Bonus Yield
200.32% +0.32%
miningCritChance
Critical Success Chance
0.79% -0.21%
miningAmount
Mining amount
243.35m3 +43.35m3
maxRange
Optimal Range
21539.06m +2789.06m
power
Powergrid Usage
13.85MW +3.85MW
effectiveMiningSpeed
Effective Mining Speed
5.06m³/s +0.53m³/s
est. 891 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
30.05GJ +7.05GJ
duration
Activation time / duration
49.47s +4.47s
cpu
CPU usage
48.4tf -1.6tf
miningCritBonusYield
Critical Success Bonus Yield
177.71% -22.29%
miningCritChance
Critical Success Chance
1.14% +0.14%
miningAmount
Mining amount
240.65m3 +40.65m3
maxRange
Optimal Range
14433.75m -4316.25m
power
Powergrid Usage
14.4MW +4.4MW
effectiveMiningSpeed
Effective Mining Speed
4.96m³/s +0.43m³/s
est. 884 million ISK Created by cao an wtf
Abyssal Gas Cloud Scoop Syndicate Gas Cloud Scoop Unstable Gas Cloud Scoop Mutaplasmid
capacitorNeed
Activation Cost
8.44GJ -1.56GJ
duration
Activation time / duration
30.05s +0.05s
cpu
CPU usage
21.73tf -4.27tf
miningAmount
Mining amount
25.92m3 +5.92m3
maxRange
Optimal Range
1558.95m +58.95m
power
Powergrid Usage
2.01MW +0.01MW
miningSpeed
Mining Speed
0.86m³/s +0.2m³/s
est. 877 million ISK Created by cao an wtf
Abyssal Modulated Strip Miner Modulated Strip Miner II Unstable Modulated Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
31.08GJ +1.08GJ
duration
Activation time / duration
42.12s -2.88s
cpu
CPU usage
81.43tf +21.43tf
miningCritBonusYield
Critical Success Bonus Yield
219.29% +19.29%
miningCritChance
Critical Success Chance
0.81% -0.19%
miningAmount
Mining amount
152.76m3 +32.76m3
maxRange
Optimal Range
13716.75m -1283.25m
power
Powergrid Usage
9.82MW -2.18MW
miningWasteProbability
Residue Probability
42.59% +8.59%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.033x +0.033
effectiveMiningSpeed
Effective Mining Speed
3.69m³/s +0.97m³/s
est. 874 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
18.62GJ -4.38GJ
duration
Activation time / duration
47.55s +2.55s
cpu
CPU usage
50.78tf +0.78tf
miningCritBonusYield
Critical Success Bonus Yield
194.23% -5.77%
miningCritChance
Critical Success Chance
1.28% +0.28%
miningAmount
Mining amount
227.42m3 +27.42m3
maxRange
Optimal Range
16558.13m -2191.88m
power
Powergrid Usage
10.27MW +0.27MW
effectiveMiningSpeed
Effective Mining Speed
4.9m³/s +0.37m³/s
est. 862 million ISK Created by cao an wtf
Abyssal Strip Miner ORE Strip Miner Unstable Strip Miner Mutaplasmid
capacitorNeed
Activation Cost
20.18GJ -2.81GJ
duration
Activation time / duration
47.1s +2.1s
cpu
CPU usage
65.52tf +15.52tf
miningCritBonusYield
Critical Success Bonus Yield
193.81% -6.19%
miningCritChance
Critical Success Chance
1.29% +0.29%
miningAmount
Mining amount
242.18m3 +42.18m3
maxRange
Optimal Range
19002.19m +252.19m
power
Powergrid Usage
9.85MW -0.15MW
effectiveMiningSpeed
Effective Mining Speed
5.27m³/s +0.74m³/s
est. 858 million ISK Created by cao an wtf
Display:
Attribute Bars:
Page 1