Abyssal Gas Cloud Harvester Gas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
6.95GJ -3.05GJ
duration
Activation time / duration
83.92s +3.92s
cpu
CPU usage
61.16tf -4.84tf
miningAmount
Mining amount
129.06m3 +29.05m3
maxRange
Optimal Range
1790.78m +290.77m
power
Powergrid Usage
10.06MW +0.06MW
miningWasteProbability
Residue Probability
35.51% +1.51%
miningWastedVolumeMultiplier
Residue Volume Multiplier
0.933x -0.067
miningSpeed
Mining Speed
1.54m³/s +0.29m³/s
Thorne 'Gargoyle' Valois

AI value prediction

Evaluated 4 d ago

Confidence Moderate R² 0.43
Bias score Moderate 431 samples
Avg. error (MAE) ±24M the lower, the better
Last trained 47 min ago
Training data
Faction 40Tech I 9Tech II 382
View historic sales →
Search type
Gas Cloud Harvester I
0
Gas Cloud Harvester II
0
ORE Gas Cloud Harvester
6