Abyssal Gas Cloud Harvester Gas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
12.82GJ +2.82GJ
duration
Activation time / duration
80.02s +0.02s
cpu
CPU usage
93.92tf +27.92tf
miningAmount
Mining amount
94.31m3 -5.68m3
maxRange
Optimal Range
1650.53m +150.53m
power
Powergrid Usage
13.79MW +3.79MW
miningWasteProbability
Residue Probability
35.94% +1.94%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.116x +0.116
miningSpeed
Mining Speed
1.18m³/s -0.07m³/s
Thorne 'Gargoyle' Valois

AI value prediction

Evaluated 4 d ago

Confidence Moderate R² 0.43
Bias score Moderate 431 samples
Avg. error (MAE) ±24M the lower, the better
Last trained 46 min ago
Training data
Faction 40Tech I 9Tech II 382
View historic sales →
Search type
Gas Cloud Harvester I
0
Gas Cloud Harvester II
0
ORE Gas Cloud Harvester
6