Login
Abyssal Gas Cloud Harvester Gas Cloud Harvester II Unstable Gas Cloud Harvester Mutaplasmid
capacitorNeed
Activation Cost
10.48GJ +0.48GJ
duration
Activation time / duration
72.26s -7.74s
cpu
CPU usage
59.55tf -6.46tf
miningAmount
Mining amount
114.79m3 +14.79m3
maxRange
Optimal Range
1613.4m +113.4m
power
Powergrid Usage
13.18MW +3.18MW
miningWasteProbability
Residue Probability
38.18% +4.18%
miningWastedVolumeMultiplier
Residue Volume Multiplier
1.111x +0.111
miningSpeed
Mining Speed
1.59m³/s +0.34m³/s
Thorne 'Gargoyle' Valois

AI value prediction

Evaluated 4 d ago

Confidence Moderate R² 0.43
Bias score Moderate 431 samples
Avg. error (MAE) ±24M the lower, the better
Last trained 15 h ago
Training data
Faction 40Tech I 9Tech II 382
View historic sales →
Gas Cloud Harvester I
0
Gas Cloud Harvester II
0
ORE Gas Cloud Harvester
6